HEALTH & SAFETY INFORMATION

Prior to commencing any works on site a detailed site investigation is carried out to assess all potential risks and hazards.

A site specific works method statement is then produced which outlines in detail :
  • The procedures involved in establishing and removing the nets:
  • guidance notes for the client to enable them to familiarise themselves with:
                           - general recommendations for the installation and use of safety nets
                           - the role of the roofing contractor, or main contractor
                           - the role of our company in establishing and removing the net system
                           - agents likely to damage the nets
                           - site inspection ie: checking that nets are rigged correctly

When the nets have been installed and inspected by our team and a handover certificate completed by our certified rigger, the client can then commence works above the safe area of the net.

A project specific Health and Safety Manual is also prepared prior to rigging of nets, the manual including the following :
  • Company Health and Safety Policy, to view click here
  • Company structure and Personnel
  • Identification of Specific Work Areas in which the Nets are Installed
  • Hazard Register / Analysis of Specific Work Areas
  • Personal Safety Equipment Registers
  • Serious Harm Flow Chart identifying Procedures to be Followed in the Event of Serious Harm Accident
  • Investigation Flow Chart
  • Site Specific Induction Form

All of our safety documentation has been produced in such a format as to ensure that it complements the overall site safety policy and manual that the Principal Contractor is required to establish on all projects.